Prefab modules constructed from a steel structure and a cellular concrete floor combined.
These homes are designed for student housing for permanent use.
The modular units will be produced in the Netherlands and will be transported by truck to Sion, a city in the province of Valais (southern part of Switzerland). The project is developed by the local Tempohousing company in Sion.
For this project 3 meter wide units in several lengths (maximum 14 meter) providing the optimal configuration for different types of apartments creating a dynamic range of living options for the students in Sion.
The campus is planned to be build in 2 phases. Production starts in August 2017 and the entire project will be completed in December 2017.
Phase 1 includes communal services such as a cafe/ restaurant, gym and laundry facilities.
Model: modular homes